Day 12 - September 13th

SimX continued making connections here and there and installed the last two roof panels on the visual dome. The host wiring was completed (I think) and the Integration guys from CAE fired up the host computer and engineering terminals.

The EMM setup got underway, but was stopped because the incorrect voltage was coming in from the supply transformer. The motion jacks got a nitrogen charge that acts as 'bumper' for smoothing out jolts and turn-arounds.

From here on out there won't be any big changes, so the number of pictures will probably wane. I'll continue to log the stuff that happens each day and try to find interesting things to take pictures of.