Day 3 - September 4th

Today the second truck arrived. It contained a couple of medium-sized pallets that included visual components, framework and trim pieces. It was quickly unloaded and then installation resumed.

The floor was marked and drilling began for the motion base bolts. The accessway installation was completed. Computer room layout was finalized and assembly of the computers continued. the electricians arrived earlier than expected and got some work done. The welder showed up and installed the filler plate for the accessway threshold and painted it. And the accessway battery box was mounted.

Accessway ramp installed